Breaking News
The AREDN Mesh Network has now connected 3 States! A work session on Friday, 6/26/24, at the Shapleigh, Maine hub, made the connection to NH. …
The AREDN Mesh Network has now connected 3 States! A work session on Friday, 6/26/24, at the Shapleigh, Maine hub, made the connection to NH. …
Today, March 9, 2024, the team of K1EHZ, N1MYY, KX1B and KD2BEC along with tower climbers, installed microwave dishes at the Haverhill DMR site. This …
Occasionally the rime ice needs to be melted off our antenna! Amazing what ice and wind can do at 6288′. The wind was clocked at …
The Marathon will be held on Monday, October 11, 2021. The Marathon team will utilize NEDECN between the Start in Hopkinton and the Finish in …